A checkout pull request can make a button clearer and still make it harder to recover from a declined payment. A green test run might miss that if it covers only the successful payment path. That is the distinction worth keeping when a tool proposes changes faster than a team can review them.
On November 18, 2026, Google Labs introduced Stitch Loop as an experiment and opened a waitlist. Google describes an agent that uses a repository and product signals to suggest improvements. After a person chooses a direction, it can build the change in a sandbox and open a GitHub pull request. Google says a person reviews the PR before it can merge, and that the agent watches live data afterwards. The announcement describes the intended workflow; it does not show that a particular team got better results from it.
The example below is fictional. It is a review process a team can use whether a person or an agent authored the patch.
Review the revision that will actually ship
Suppose revision A makes a checkout error message clearer. Revision B keeps that copy but also moves keyboard focus after a declined test payment. The earlier review only covered wording. It does not establish that the new focus behavior is usable.
In the PR, link the current commit to its test run and name the flows that changed. For revision B, simulate a declined payment, then verify with only the keyboard that focus lands on the agreed recovery target, the error can be found, and the shopper can correct the problem without losing non-sensitive progress. Check a narrow screen as well. A screenshot can show the text; it cannot show where keyboard focus went.

AI-generated illustration of the fictional keyboard checkout test, not a product screenshot or a test result.
GitHub’s ruleset documentation treats dismissing stale approvals when the reviewed diff changes and requiring approval of the latest reviewable push as distinct options. The latter does not on its own discard all earlier approvals. Pick the rule that matches the risk, and tie the evidence to the revision that was reviewed. The same principle shows up in conditional saves for AI-assisted listing drafts: a decision made against one version should not quietly authorize another.
Decide what success means before rollout
For this example, define the outcome as the share of unique eligible shoppers who start checkout and complete a purchase within a fixed window. Start the experiment at checkout entry, keep each shopper’s assignment stable and count each shopper once. A clearer button may get more clicks without producing more completed orders.
Choose checks for payment errors and the ability to recover from a decline. Agree in advance who monitors them, how long to observe, what counts as enough evidence, and who can switch off the change. A focus regression verified in the checkout should not get a pass just because click-through improved. A small, time-limited release can test operational safety before any wider rollout; see Google’s SRE guidance on canarying releases. A stable canary and a valid estimate of conversion impact are two different pieces of evidence.
When the numbers look better, check who was counted
Imagine a planned 50/50 test. The analysis shows 6,000 checkout starters in control and 4,000 in the variant. Control records 480 completed purchases (8.0%); the variant records 336 (8.4%). All counts are invented. The apparent increase of 0.4 percentage points is not a reason to ship.
The first question is why the counted groups disagree with the configured split. Compare assignment counts with exposure records before looking at purchases. Check for duplicate identities, missing events and filters or joins that could remove people from just one group. Confirm the purchase attribution window is identical on both sides. Do not drop 2,000 control shoppers to make the totals look even. Microsoft Research’s sample-ratio mismatch guide explains why diagnosing the mismatch comes before interpreting the result.
Hold the rollout decision until the counting problem is understood. If the evidence cannot be repaired, restart the test or record it as inconclusive. If the new checkout is already hurting payment recovery, roll back rather than waiting for the experiment to finish.
Give each decision an owner
A code reviewer can approve the exact revision without authorizing wider exposure. A release owner can start a limited rollout without declaring that conversion improved. And whoever is watching the release needs a clear way to stop it without waiting for the next code review.
A useful PR leaves the next person four things: the revision and its test run, the behavior that changed, the metric and checks used after release, and the name of the person who can stop it. An agent can assemble that evidence. Someone still has to decide whether it answers the right question.